[1] |
夏汉平.人工湿地处理污水的机理与效率.生态学杂志,2002,21(4):51-59 Xia Hanping. Mechanisms and efficiencies on wastewater treatment with constructed wetlands. Chinese Journal of Ecology, 2002, 21(4):51-59(in Chinese)
|
[2] |
Hiley P.D. The reality of sewage treatment using wetland. Water Science and Technology, 1994, 32(3):329-338
|
[3] |
Reddy K.R., DeBusk T.A. State-of-the-art utilization of aquaticplants in water pollution control. Wat. Sci.Technology, 1987, 19(10):61-79
|
[4] |
Martin J.P. Restoration of an urban river in Barcelona, Spain. Environmental Engineering and Policy, 2001, 2(3):113-119
|
[5] |
Jing Shuh-Ren, Lin Yingfeng. Seasonal effect on ammonia nitrogen removal by constructed wetlands treating polluted river water in southern Taiwan. Environmental Pollution, 2004, 127(2):291-301
|
[6] |
陈源高,李文朝,李荫玺,等.云南抚仙湖窑泥沟复合湿地的除氮效果.湖泊科学,2004,16(4):331-336 Chen Yuangao, Li Wenchao, Li Yinxi., et al. Nitrogen remove efficiency of Yao Nigou integrated constructed wetland on the bank of Lake Fuxian, Yunnan Province. Journal of Lake Sciences, 2004, 16(4):331-336(in Chinese)
|
[7] |
赵建,朱伟,赵联芳.人工湿地对城市污染河水的净化效果及机理.湖泊科学,2007,19(1):32-38 Zhao Jian, Zhu Wei, Zhao Lianfang. Efficiency and mechanism of treating the polluted river water with constructed wetland. Journal of Lake Sciences, 2007, 19(1):32-38(in Chinese)
|
[8] |
国家环境保护总局.水和废水监测分析方法(第4版).北京:中国环境科学出版社,2002.200-202
|
[9] |
吴树彪,董仁杰.人工湿地污水处理应用与研究进展.水处理技术,2008, 34(8):5-10 Wu Shubiao, Dong Renjie. The application and research progress of constructed wetland for wastewater treatment. Technology of Water Treatment, 2008, 34(8):5-10(in Chinese)
|
[10] |
张荣社,李广贺,周琪,等.潜流人工湿地负荷变化对脱氮效果的影响研究.环境科学,2006,27(2):253-256 Zhang Rongshe, Li Guanghe, Zhou Qi, et al, Relationships between loading rates and nitrogen removal effectiveness in subsurface constructed wetlands. Environmental Science, 2006, 27(2):253-256(in Chinese)
|
[11] |
钟成华,李杰,邓春光.人工湿地废水处理中氮、磷去除机理研究.重庆建筑大学学报,2008,30(4):141-146 Zhong Chenghua, Li Jie, Deng Chunguang. Advances in the study of nitrogen and phosphorus removal mechanisms in constructed wetlands. Journal of Chongqing Jianzhu University, 2008, 30(4):141-146(in Chinese)
|
[12] |
卢少勇,金相灿,余刚.人工湿地的氮去除机理.生态学报,2006,26(8):2670-2677 Lu Shaoyong, Jin Xiangcan, Yu Gang. Nitrogen removal mechanism of constructed wetland. Acta Ecologica Sinica, 2006, 26(8):2670-2677(in Chinese)
|
[13] |
宋志文,王仁卿,席俊秀,等.人工湿地对氮、磷的去除效率与动态特征.生态学杂志,2005,24 (6):648-651 Song Zhiwen, Wang Renqing, Xi Junxiu, et al. Nitrogen and phosphorous removal efficiency and dynamic feature of constructed wetlands for sewage treatment. Chinese Journal of Ecology, 2005, 24(6):648-651(in Chinese)
|
[14] |
郭本华,汤华崇,宋志文,等.人工湿地的净化机理及对氮磷的去除效果.污染防治技术,2003,16(4):119-121 Guo Benhua, Tang Huachong, Song Zhiwen,et al. Theoryof wastewater treatment by constructed wetland and removal of nitrogen and phosphorus. Pollution Control Technology, 2003, 16(4):119-121(in Chinese)
|
[15] |
李旭东,周琪,张荣社,等.三种人工湿地脱氮除磷效果比较研究.地学前缘,2005,12(特刊):73-76 Li Xudong, Zhou Qi, Zhang Rongshe, et al. A comparative study on nitrogen and phosphorys removal performance for three types of constructed wetlands.Earth Science Frontiers, 2005, 12(Suppl):73-76(in Chinese)
|
[16] |
袁东海,景丽洁,高士详,等.几种人工湿地基质净化磷素污染性能的分析.环境科学,2005,26(1):51-55 Yuan Donghai, Jing Lijie, Gao Shixiang, et al. Analysis on the removal efficiency of phosphorus in some substrates used in constructed wetland systems. Environmental Science, 2005, 26(1):51-55(in Chinese)
|
[17] |
Sakadevan K., Bavor H.J. Phosphate adsorption characteristics of soils, slags and zeolite to be used assubstrates in constructed wetland systems. Water Res.,1998, 32(2):393-399
|
[18] |
张荣社,李广贺,周琪,等.潜流人工湿地负荷变化对脱氮效果的影响研究.环境科学,2006,27(2):253-256 Zhang Rongshe, Li Guanghe, Zhou Qi, et al. Relationships between loading rates and nitrogen removal effectiveness in subsurface constructed wetlands.Environmental Science, 2006, 27(2):253-256 (in Chinese)
|